Sunday, May 15, 2011

Site Work

I like seeing things actually start on this project.

Looks like we need to do some site work so that we can get it all prepped:

  1. Remove shrubs at the front of the lot.
  2. Trim (to 5-6 ft) all the Arborvitae (Yes, there IS a website dedicated to arborvitae.  Who knew) on the left of the lot.  Too tall and falling down. Will inhibit the passage of construction equipment.
  3. Remove shrubs, vines, and brush from back of lot.
  4. Trim any branches that fall below the power line hight (14ft)
We're getting close to a start.