Today I stopped down to drop of water and Gatorade and got there just in time to see 84 Lumber delivering forklift loads of 2x6 studs and massive loads of plywood.
Also, the engineered limber I beams were on site as well.
Today I expect to see serious vertical changes.
No comments:
Post a Comment