Sunday, July 24, 2011

Too, F'ing Hot!!!


First of all, I cannot imagine working the way the construction crew does in 85º heat... let alone 101º.  But, they would it seems if it were not for the fact that the concrete guys can't do their work in these temperatures.  Don't know the exact details, but it seems that if it is too cold or too hot, the cement does not set correctly and will not provide the needed compressive strength.

Hopefully monday will be better...

Mmmm, better, but wetter.

Tuesday, July 19, 2011

Backfill

Today they began to backfill the foundation.

Actually, surprising how much dirt that actually used up... the large pile on the front of the lot is completely gone.  Tomorrow they plan to dig the foundation to the garage.

Due to the "overdig" they are going to need to take out some of the arbor vitae on the left of the lot and take off a few of the larger limbs from the tree.  They will be cut by a professional as opposed to being ripped out by an excavator - so that is good.  And, I suppose the fact that we are going to be doing some pretty significant work around the root ball... the less it has to deal with leaf wise, the better.

Here's to hoping.

Monday, July 18, 2011

Sub-floor is in... we have a true basement.


When you start with a large pile of wood, like this...



...and a team of guys with air-nailers,












You end up with...

 A floor... with a hole for the stairway, and

a true basement.

Friday, July 15, 2011

Support structure...

They brought in a support beam today that will support the upper floors.

With the pre-fab foundation in place already, they really just dropped it right in.

Hardening concrete and support beams


The concrete has set for about 24hrs, and then brought in the support beam for the basement.  Looks like the plan is to let it continue to cure for the weekend and then install the first floor sub-floor.

It is just amazing how fast it goes from a hole in the ground to a real house foundation.

Thursday, July 7, 2011

The dig progresses

They continue to dig.  It really is amazing to watch them use that excavator so effortlessly.

Also learned about there GPS guided, laser level.  They spin this bad boy up, it gets its GPS location, then fires out an infrared laser beam that they can measure everything from.  They were checking 1/4 inch depths at the bottom of the dig.

Here you can see how deep this hole really is.



And, I think this one speaks for itself.

Wednesday, July 6, 2011

One hell of a hole...

This is how it all starts.  First, they dig a big hole in the ground.  About 9-10 ft deep.



Diggers, trucks and bottles... oh my!

So, I've been really bad about keeping things up to date on this site.  But, I'll try a little harder now that things have really begun.   Up until today, things have been pretty drawn out.  I suppose that is how it happens.  In any case, I will go back in try to fill in the details a little.

But today, here is where we stand...

I spun by the site this morning at about 9a and met up with Patrick Davish, one of Janiczek Homes sub-contractors.  At that very instant I got to see on of the mega dump-trucks back in to the lot.


Apparently Patrick was meeting with the SIPS Foundation Wall distributors.  They have to do some serious measuring for a crane that will be bringing in the foundation segments.

Anyway, think of SIPS as giant lego blocks used to build the foundation quickly.  It is designed as a re-bar reinforced insulated pannel that acts as a form for concrete pour.  Very fast to build, strong and quite cost effective.

The crew also found an old glass bottle from what seems to be 1911 (embossed on the bottom).  Will post a picture of that ASAP.

We're rolling!