So, I've been really bad about keeping things up to date on this site. But, I'll try a little harder now that things have really begun. Up until today, things have been pretty drawn out. I suppose that is how it happens. In any case, I will go back in try to fill in the details a little.
But today, here is where we stand...
I spun by the site this morning at about 9a and met up with Patrick Davish, one of Janiczek Homes sub-contractors. At that very instant I got to see on of the mega dump-trucks back in to the lot.
Apparently Patrick was meeting with the
SIPS Foundation Wall distributors. They have to do some serious measuring for a crane that will be bringing in the foundation segments.
Anyway, think of SIPS as giant lego blocks used to build the foundation quickly. It is designed as a re-bar reinforced insulated pannel that acts as a form for concrete pour. Very fast to build, strong and quite cost effective.
The crew also found an old glass bottle from what seems to be 1911 (embossed on the bottom). Will post a picture of that ASAP.
We're rolling!